A summary of some examples which show some reasons that possibly lead to shedding.
Created on:2021-10-15 08:00
A summary of some examples which show some reasons that possibly lead to shedding.
To use the same thermoplastic paint on the same road, different construction team possibly cause the big difference on quality of road marking. Under the same traffic situation, some thermoplastic road markings are guaranteed for 12 months, and some possibly only for 6 months, even some may fall off within a few days or weeks. This shows that the construction technology is crucial as well as the quality of paint in the process of road marking construction.
Except the quality of paint itself, the following is a summary of examples which show some reasons that possibly lead to shedding.
A: Water on ground or Too wet
Suggestion: Stop construction before the ground is fully dry. After rain or road sprinkling, do not mark the line. The road surface needs to be dried when it is necessary.
B: The temperature of road surface is too low (below 10 ℃).
Low temperature can cause hot melt coating to cure without sufficient contact with the ground.
Suggestion: Wait for the temperature to rise, or preheat the road surface if necessary.
C: Some situation about primer.
Such as primer is not dry, is not evenly sprayed, the coating of primer is too thick, and so on.
Suggestion: Wait for primer coating to dry completely before applying, and ensure primer spraying evenly. Do not overuse, generally 0.15kg per square meter.
D: Not clean road surface, there is some dust, sand or oil stain.
Suggestion: Cleaning equipment can be used to thoroughly sweep and clean the road surface to ensure that the road surface is clean
E: Without primer on concrete road.
Suggestion: To use primer is necessary for marking on concrete road.
F: Old line are not processed before re-coating new line on it.
Suggestion: Removing old line completely, or roughen surface of old line before applying.

Quick Contact
If you need the same products as above, contact us directly, please.
A summary of some examples which show some reasons that possibly lead to shedding.
Created on:2021-10-15 08:00
To use the same thermoplastic paint on the same road, different construction team possibly cause the big difference on quality of road marking. Under the same traffic situation, some thermoplastic road markings are guaranteed for 12 months, and some possibly only for 6 months, even some may fall off within a few days or weeks. This shows that the construction technology is crucial as well as the quality of paint in the process of road marking construction.
A summary of some examples which show some reasons that possibly lead to shedding.
To use the same thermoplastic paint on the same road, different construction team possibly cause the big difference on quality of road marking. Under the same traffic situation, some thermoplastic road markings are guaranteed for 12 months, and some possibly only for 6 months, even some may fall off within a few days or weeks. This shows that the construction technology is crucial as well as the quality of paint in the process of road marking construction.
Except the quality of paint itself, the following is a summary of examples which show some reasons that possibly lead to shedding.
A: Water on ground or Too wet
Suggestion: Stop construction before the ground is fully dry. After rain or road sprinkling, do not mark the line. The road surface needs to be dried when it is necessary.
B: The temperature of road surface is too low (below 10 ℃).
Low temperature can cause hot melt coating to cure without sufficient contact with the ground.
Suggestion: Wait for the temperature to rise, or preheat the road surface if necessary.
C: Some situation about primer.
Such as primer is not dry, is not evenly sprayed, the coating of primer is too thick, and so on.
Suggestion: Wait for primer coating to dry completely before applying, and ensure primer spraying evenly. Do not overuse, generally 0.15kg per square meter.
D: Not clean road surface, there is some dust, sand or oil stain.
Suggestion: Cleaning equipment can be used to thoroughly sweep and clean the road surface to ensure that the road surface is clean
E: Without primer on concrete road.
Suggestion: To use primer is necessary for marking on concrete road.
F: Old line are not processed before re-coating new line on it.
Suggestion: Removing old line completely, or roughen surface of old line before applying.